The Full Wiki

More info on Pierre LaPoubelle

Pierre LaPoubelle: Misc

Advertisements
  

Fallout

Up to date as of February 01, 2010

From The Vault

Pierre LaPoubelle
Biography
race: Human
gender: Male
affiliation: Formerly Brotherhood of Steel
role: Former Scribe
Chief Engineer
location: Hoover Dam Rim
Gameplay
appearances: Van Buren (canceled)
quests: Give filtration schematics to former BOS scribes for better water purification process
Statistics
SPECIAL: ST 6, PE 7, EN 5, CH 4, IN 8, AG 6, LK 5
level: 15
Technical
The following is based on Van Buren and has not been confirmed by canon sources.

Pierre LaPoubelle is the Chief Engineer of the three former Brotherhood of Steel Scribes in the Hoover Dam Engineering Facility in 2253.

Contents

Background

Pierre LaPoubelle was born in 2201. He is a former scribe from Maxson's Bunker, along with his other scribe buddies. He came to Hoover out of frustration with the direction the BOS was going and wanted to lend his peaceful services to the growing community of Hoover Dam, despite the fact the government was NCR based. It is due in large part to Governor Dodge's fair-handed and peace-seeking ways of ruling that Pierre et al stayed in Hoover Dam and volunteered their services. However, neither of the former scribes told the truth about where they came from because they did not want to jeopardize the lives of their remaining friends at Maxson's Bunker.

Pierre is a strong and hearty looking man in his early fifties. He is very smart and loves to dive wholly into his work. He is currently working on creating stronger and heartier wheat and corn that can grow in the wasteland's hard and dry soil. Also, he is working closely with Otto Steed to try and find a better water filtration process to turn the non-drinkable irrigation water into a fully drinkable version[1].

Interactions with the player character

Advertisements

Give filtration schematics to former BOS scribes for better water purification process

Pierre has been tasked with creating a better filtration process to make the irrigation water drinkable. He'll ask the player if he sees anything in the wasteland that could help, he would appreciate the feedback. He'll suggest the player go to Jericho since that is where they get most of their drinking water from. The player can then go to Jericho, do his thing there and hopefully get some filtration schematics out of it). Coming back to Hoover, the player can do one of two things, depending on his skills: The first is if the player has really good mechanics skills. The player may then install the upgrades to the filtration process and earn the hooplas of Pierre, along with an advanced toolset (or whatever the best toolset is in the game). The second option is to just give the schematics to Pierre and let him deal with it. He'll get the upgrades in, but the player will have to be content with the XP, a regular tool, and Pierre just being a bit friendlier. Who knows, maybe he'll divulge the whereabouts of Maxson's Bunker?[1]

Appearances

Pierre LaPoubelle was going to appear in Van Buren, the canceled Fallout 3 by Black Isle Studios.

References

  1. 1.0 1.1 Hoover Dam design document by Damien Foletto
Hoover Dam

This article uses material from the "Pierre LaPoubelle" article on the Fallout wiki at Wikia and is licensed under the Creative Commons Attribution-Share Alike License.

Advertisements






Got something to say? Make a comment.
Your name
Your email address
Message